Metal Ministry Inc — RMC and TMT Bar

Ready mix concrete & TMT steel bar

Concrete and steel for the same slab, from one supplier.

Ready mix concrete and TMT steel bar, from one supplier, on one delivery schedule. Grades to IS 456 and IS 1786, test papers with every delivery, and a schedule built around your pour date rather than our despatch queue.

M7.5–M60Concrete grades
Fe500–Fe550DBar grades + CRS
20 yrsIn the trade
Navi MumbaiHead office

Two divisions

Pick the material you are buying today

Each division runs its own rate card, its own service-area list and its own technical pages. Buying both together is where the scheduling advantage sits, but neither depends on the other.

Division

Ready Mix Concrete

M7.5 to M60 batched to IS 456, cube-tested at 7 and 28 days, transit mixers and boom placers scheduled around your pour window.

  • M7.5 to M60, design and nominal mixes
  • Line pump and boom placer on call
  • Cube testing at 7 and 28 days included
  • Night pours where traffic rules require it
Open the Ready Mix Concrete site

Division

TMT Bar

Fe500, Fe500D, Fe550, Fe550D and CRS bars from primary mills. Mill test certificate with every load, verified weight, delivery cut to your bar bending schedule.

  • Fe500, Fe500D, Fe550, Fe550D and CRS
  • 8 mm to 40 mm, primary mills only
  • Mill test certificate with every load
  • Cut and bent to your BBS on request
Open the TMT Bar site

What is standard, not extra

The parts of the order nobody quotes for

IS 456 & IS 1786

Concrete batched to IS 456. Bars conform to IS 1786. Both are stated on the invoice, not just in the brochure.

One purchase order

Concrete and reinforcement on a single account, single credit line, single point of escalation.

Test reports as standard

Mill test certificate with every steel load. Cube results at 7 and 28 days on letterhead for every pour.

Scheduled to the pour

Bar bending schedule read first, then steel dispatched ahead of the shutter. Mixers timed to the placement rate, not the plant's convenience.

Why buy the pair together

One programme, one account, one desk

The slab is one item, not two

A slab fails at the interface between concrete and steel, so it is worth buying both from a supplier who has to answer for both. When cover blocks are wrong, or the bar diameter substituted, or the mix arrives with the slump gone, there is one desk to call.

Sequencing beats price by a mile

Steel that lands a week early sits in the mud. Concrete that lands an hour early sets in the drum. We plan the two against the same programme, so the tonnage and the cubic metres arrive against the same date, not against two separate order books.

Rates you can put in a BOQ

Basic rate, GST and freight are quoted as three separate lines for steel; basic rate, pumping and GST as three separate lines for concrete. Nothing appears on the invoice that was not on the quotation.

How an order runs

From drawing to delivery

  1. 1

    Send the drawing

    Bar bending schedule for steel, grade and volume for concrete. WhatsApp or email, whichever is quicker.

  2. 2

    Get the rate

    Written quotation the same working day, with each charge on its own line.

  3. 3

    Confirm the slot

    Steel is released against the schedule. The pour window is booked at the plant.

  4. 4

    Delivery and papers

    Material arrives with test certificates. Weighment slip for steel, batch docket for concrete.

Send the schedule. Get the rate back today.

Bar bending schedule for the steel, grade and cubic metres for the concrete. Quotation the same working day, with every charge on its own line.